UltraRAE 3000 Advanced User Certificate Training

Click here to see the current class schedule and to register.

Download the Training Pricing Guide

UltraRAE 3000 Advanced User Certificate Training

Course Number: UT102

Duration: One day, 8:30 a.m. – 5:00 p.m.

Certification: Dated Certificate of Completion, valid for 2 years

Overview

Attendees who complete this class and pass the examination at the end will be able to:

  • Understand how a PID works
  • Understand UltraRAE 3000 Compound-Specific Operation
  • Conduct Compound-Specific Measurements
  • Use Separation Tubes
  • Understand Basic and Advanced Survey Mode and Hygiene Mode
  • Interpret the User Interface and use the built-in libraries
  • Practice sampling live gases and interpreting results
  • Download datalogged data and upload configurations and firmware upgrades
  • Service and maintain the UltraRAE 3000, including:
    • Calibrate the monitor
    • Conduct standard field diagnostic tests
    • Maintain PID lamp and pumps
    • Replace lamp

Agenda

Time
Subject
8:30 a.m. - 10:00 a.m. Photoionization detectors
  • Features, benefits and limitations of PID technology
  • Specialized features of the UltraRAE 3000 (RAE Separation Tubes)
10:00 a.m. - 12:00 p.m. Using the UltraRAE 3000 (hands-on workshop)
  • Understanding the user interface and theory of operation
  • Compound-Specific Measurement
  • Measurement Phases
  • Performing a Measurement
  • Separation Tube Preparation
  • Inserting the Separation Tube
  • Measuring
  • Best practices
12:00 p.m. - 1:00 p.m. Lunch hosted by RAE Systems
1:00 p.m. - 3:30 p.m. Using the UltraRAE 3000 (hands-on workshop)
  • Using a Tedlar bag
  • Two-point calibration
  • Three-point calibration
  • Calibration with benzene
  • Practice sampling live gases and interpreting results
  • Download datalogged data and upload configurations and firmware upgrades
3:30 p.m. - 4:30 p.m. Maintaining the UltraRAE 3000
  • An overview of Diagnostic Mode and hands-on practice of standard field diagnostic tests
  • Conduct field verification and calibration
  • Troubleshooting the UltraRAE 3000
  • Changing the measurement time
  • Maintain PID lamp
  • Replace lamp
4:30 p.m. - 5:00 p.m. Test